MIRSONIA APARTMENTS

PROJECT AT A GLANCE

Location

San Juan, Puerto Rico

Architect

V Architecture, PSC

Project Type

New Construction

Market

Housing

Project Size

38,000 sq. ft.

Service

Construction (CMc)

Project Overview

  • Project required extensive dewatering in order to build an underground parking structure mostly submerged under the water table. Construction of underground parking structure below water table

This mid-rise condominium project consisted of 7 apartment units (one per floor) with an underground parking structure. Each of the units included a very high level of detail with customs kitchens, high end woodwork, marble floors, audio visual, data and security infrastructure, as well as impact resistant windows and doors. The project, although not very large in scale, presented very challenging construction requirements. Designed on a very small urban lot in a densely built area, the design called for the construction of a two and a half level underground parking structure tightly squeezed between neighboring properties and sitting 30 feet under the water table. In order mitigate any settlement of adjoining structures and the floating effect caused by the high-water table, careful and detailed construction calculations and monitoring were performed in order to balance the dewatering necessary to stabilize both the new building structure and its adjoining neighbors. As part of the foundation work, the construction methods selected included the use of tangent piles along the basement perimeter and concrete driven piles as deep foundation system.

Let’s Discuss Your Project

 

Contact the DDD team today to start discussing you vision and benefit from the tremendous insight and experience of one of the most prolific construction companies in Puerto Rico. Please send us an email or call us to for all inquiries related to this project, or any of our comprehensive services.