Carolina, Puerto Rico
DDD Architecture, PSC
New Construction
6,200 sq. ft.
Under a two-phase design-build approach, DDD was hired to design and build the improvements required to comply with the Mercedes-Benz (MBUSA) Design Guidelines. Under the contract, DDD had to incorporate a 6,200 sf workshop addition to house additional workshop area. As part of the Scope, DDD was required to also design and build a new substation and electrical service infrastructure to provide enough capacity for the new facilities and any future expansion.
The workshop areas were built using a structural steel system covered with a combination of cement plastered concrete block and metal siding. The building included the use of overhead sprinklers, fire and smoke detectors over the whole facility. As on the other jobs, multiple energy conservation methods were used including natural ventilation and lighting controls to maximize the use of daylight. DDD self-preformed 60% of the work.
Contact the DDD team today to start discussing you vision and benefit from the tremendous insight and experience of one of the most prolific construction companies in Puerto Rico. Please send us an email or call us to for all inquiries related to this project, or any of our comprehensive services.