Design Build

Unlike traditional project delivery, which divides design and construction into two separate functions, the design/build delivery method places the design and building responsibilities under a single entity.

Under Design-Build services are established by assigning the sole responsibility of design and construction activities to one entity. Under the Design-Build approach, the owner has opportunity to reduce the project based risk and concentrate on the project criteria (the concept for the facility he needs), while we become responsible for the delivery. During this stage, if the owner wishes, DDD helps the owner to asses and create a clear and concise project design criteria. DDD then becomes fully engaged in project coordination, constructability and delivery under one established budget.

Design-build brings both design and construction together under various configurations, in order to overcome traditional obstacles involving time, construction costs and flexibility to innovate.

As expressed above, the true success of this type of project delivery is derived from the understanding that every project must be a result of a clear project plan. With higher than average standard of care, DDD can provide the success that clients look for. A project schedule with an improved delivery time and cost savings.

This improved project delivery is achieved by re-organizing project phases and design decisions upstream in the project cycle, where they can produce more effective results. Differing from the traditional approach of design-bid-build, this shift results in up streaming certain services that where typically carried out once construction drawings were completed, to when conceptualization and schematic drawings are occurring. By achieving this, certain early phases of design carry a heavier work load, but minimize risk on later services of the project life cycle.


This method offers unique advantages to owners, like:
  • One source of responsibility for any design or construction project
  • Integrated Decision Process
  • Lean Approach
  • Solutions engineered and “Guaranteed” to fit your budget
  • No Change Orders
  • Savings as a result of the “fast-track” nature of the process
  • Sustainable Solutions that decreased Life Cycle Costs
  • Lean Process

Construction General Contracting


SEE MORE PROJECTS




EXPLORE ALL PROJECTS


DDD Group
PO Box 11976, Caparra Heights Station
San Juan, Puerto Rico 00922-1976
Tel. 787-706-8000
Fax 787-706-8014
udonato@dddpr.com
DOWNLOAD
Our Capability Statement



HOME
Sitemap
JOIN US!
Facebook
Linkedin


DDD Group
PO Box 11976, Caparra Heights Station
San Juan, Puerto Rico 00922-1976
Tel. 787-706-8000
Fax 787-706-8014
udonato@dddpr.com
DOWNLOAD
Our Capability Statement



HOME
Sitemap




Built for the job

© 2019 DDD Group, Inc. and its sister companies are registered trademarks of Umberto Donato.
ALL RIGHTS RESERVED







Built for the job

© 2019 DDD Group, Inc. and its sister companies are registered trademarks of Umberto Donato.
ALL RIGHTS RESERVED



DDD Logo
Close Icon Button

ABOUT US

MARKETS

SERVICES